Downloads

Technical resources and scientific validations that support your decision

Explore our complete library of technical materials and scientific validations. Access key data on the operation, and validation of the DTBird® and DTBat® systems across different wind energy environments.

Technical Specifications | DTBird FALCO

Technical Specifications | DTBird FALCO

Download
Technical Specifications | DTBird ALBATROSS

Technical Specifications | DTBird ALBATROSS

Download
Technical Specifications | DTBat

Technical Specifications | DTBat

Download
Product Catalog (2026) | DTBird & DTBat Systems

Product Catalog (2026) | DTBird & DTBat Systems

Download
Product Brochure (2026) | DTBird System

Product Brochure (2026) | DTBird System

Download
Product Brochure (2026) | DTBat System

Product Brochure (2026) | DTBat System

Download
Conference Poster (2026) | DTBat Bat Monitoring & Energy Simulations

Conference Poster (2026) | DTBat Bat Monitoring & Energy Simulations

Download
Case Study (2014) | DTBird Shutdown on Demand

Case Study (2014) | DTBird Shutdown on Demand

Download
Conference Poster (2015) | DTBird Collision Risk Reduction Evaluation

Conference Poster (2015) | DTBird Collision Risk Reduction Evaluation

Download
Technical Comparison (2013) | DTBird vs Radar Systems

Technical Comparison (2013) | DTBird vs Radar Systems

Download
2º Evaluation Phase of DTBirdV4D8 in the USA. May 2024

2º Evaluation Phase of DTBirdV4D8 in the USA. May 2024

Download
Pilot Evaluation of DTBirdV4D4 in the USA. September 2018

Pilot Evaluation of DTBirdV4D4 in the USA. September 2018

Download
Evaluation of DTBird System in the WTG Calandawind, Switzerland. DTBird Team. April 2015.

Evaluation of DTBird System in the WTG Calandawind, Switzerland. DTBird Team. April 2015.

Download
Experiences from Sweden's First DTBird Installation. Ecocom AB. December 2016.

Experiences from Sweden's First DTBird Installation. Ecocom AB. December 2016.

Download
Evaluation Of DTBird Detection Capabilities in the WTG Calandawind, Switzerland. Swiss Ornithological Institute in Sempach 2014.

Evaluation Of DTBird Detection Capabilities in the WTG Calandawind, Switzerland. Swiss Ornithological Institute in Sempach 2014.

Download
Evaluation of DTBird Detection Capabilities at Smola Wind-Power Plant, Norway. December 2012

Evaluation of DTBird Detection Capabilities at Smola Wind-Power Plant, Norway. December 2012

Download
Performance of the real-time bat detection system DTBat at the wind turbine of Calandawind. May 2015.

Performance of the real-time bat detection system DTBat at the wind turbine of Calandawind. May 2015.

Download
Evaluation Report (2025) | DTBird Detectability & Detection Range

Evaluation Report (2025) | DTBird Detectability & Detection Range

Download
ISO 9001:2015 Quality Certification | DTBird

ISO 9001:2015 Quality Certification | DTBird

Download
CE Marking Compliance Certification | DTBird

CE Marking Compliance Certification | DTBird

Download

Need more information?