Notice: Only variables should be passed by reference in /var/www/vhosts/dtbird.com/httpdocs/plugins/system/virtualdomains/virtualdomains.php on line 221
Reports
Loader
Reports
 
Evaluation Report on DTBird 2025 Models: Detectability and Detection Range. August 2025.
 
2º Evaluation Phase of DTBirdV4D8 in the USA. May 2024.
Pilot Evaluation of DTBirdV4D4 in the USA. September 2018.
Oct2015
Experiences from Sweden's first DTBird installation Ecocom AB. December 2016.
generic
Evaluation Of DTBird System In The WTG Calandawind, Switzerland. DTBird Team. 2014.
generic
Evaluation of DTBird Detection Capabilities in the WTG Calandawind, Switzerland. Swiss Ornithological Institute in Sempach 2014.
generic
Evaluation of DTBird Detection Capabilities at Smola Wind-power Plant, Norway. 2012.