Although DTBird research program started in 2005, in Mach 2009 the first DTBird unit was installed at a wind turbine of Sammca Group, in Spain. Currently over 90 DTBird&DTBat units are distributed in 11 countries.
Ever since, DTBird has been under continuous evaluation, research and improvement process with incomes from scientists, computer engineers, ornithologists and veterinarians from many countries. Current DTBird specifications can be found in the link: DTBird System Specifications for Wind Turbines. February 2017.